Skip to content

Build audience sequences

After these steps, several audiences work together as one sequence, for example a waterfall that gives every person to the highest-priority audience they belong to.

Before you begin

Edition
Professional and Ultimate
Setting
Audience results stored in the Platform Cache. See CAB Settings.
Permission
Campaign Audience Builder: User permission set group or one that contains it. See Permission sets.

A sequence is built from audiences that already exist. For the two types and what the ledger shows, see How sequences work.

  1. On the home page, select New Audience Sequence.

  2. Enter the Sequence Name, optionally choose an Audience Folder, and choose the Type: Waterfall or Combination. Then select Next. The sequence opens.

  3. Select Add Audience, search for an audience and select it. In a combination, choose the operator for every step after the first: Union, Intersection or Exclusion. Select Save & New to add the next one, or Save.

  4. Order the steps. In a waterfall, the order is the priority: a person stays in the first step they belong to.

  5. Select Run.

All audiences in a sequence have the same audience object, such as Contact. The search shows only audiences that match.

You can also start a sequence from a segment of an Overlap Analysis: Create Combination works from any segment, Create Waterfall from the segments that are only in one audience. See Compare audiences with Overlap Analysis.

After the run, the ledger shows one row per step with its results. In a waterfall:

In a combination:

  • Point at a row and drag the grip to the left of its number. Or select the grip and choose Move up, Move down, Move to top or Move to bottom. With the keyboard, focus the grip and press the up or down arrow key.

  • To remove a step, expand its row and select the delete icon, then confirm. A sequence keeps at least one step; to remove the last one, delete the sequence.

Changes are not confirmed one by one. After a run, a change marks the changed step and every step below it Out of date, and a banner offers:

  • Undo last change reverses the most recent change.
  • Re-run from step N recalculates from the first changed step and keeps the steps above it.
  • Re-run everything recalculates the whole sequence.

After a page reload, only Re-run everything is offered. When the last run is a while ago, it is the main choice. See How sequences work.

While a run you started yourself is in progress, select Cancel run above the ledger and confirm with Cancel run. Keep running lets it continue. The finished steps of that run are discarded, and the ledger shows the last finished run again. A scheduled run can’t be cancelled.

  • Waterfall: each step is its own result set. Select the eye icon in a row to open that step’s results, then act on them as for any audience. The Actions column counts what was done with each step’s results in the run shown; select the count to see the actions.

  • Combination: select View Results above the ledger for the one final result set.

To run a sequence on a schedule, see Schedule a sequence.